PMP - PROJE YÖNETİMİ EĞİTİMİ SONA ERDİ

×

Hata mesajı

  • User warning: The following module is missing from the file system: gmap. For information about how to fix this, see the documentation page. in _drupal_trigger_error_with_delayed_logging() (line 1143 of /var/www/html/includes/bootstrap.inc).
  • Notice: _bootstrap_glyphicons() (/var/www/html/sites/all/themes/bootstrap/includes/common.inc dosyasının 771 satırı) içinde Undefined index: 3.0.
  • Warning: _bootstrap_glyphicons() (/var/www/html/sites/all/themes/bootstrap/includes/common.inc dosyasının 778 satırı) içinde array_merge(): Argument #1 is not an array.
  • Warning: _bootstrap_glyphicons() (/var/www/html/sites/all/themes/bootstrap/includes/common.inc dosyasının 839 satırı) içinde array_merge(): Argument #1 is not an array.
  • Warning: _bootstrap_glyphicons() (/var/www/html/sites/all/themes/bootstrap/includes/common.inc dosyasının 845 satırı) içinde array_merge(): Argument #1 is not an array.
  • Warning: _bootstrap_icon() (/var/www/html/sites/all/themes/bootstrap/includes/common.inc dosyasının 875 satırı) içinde in_array() expects parameter 2 to be array, null given.
  • Warning: _bootstrap_icon() (/var/www/html/sites/all/themes/bootstrap/includes/common.inc dosyasının 875 satırı) içinde in_array() expects parameter 2 to be array, null given.
Ankara Şubesi

Sadık Nazik tarafından gerçekleştirilen "PMP - Proje Yöntemi" konulu eğitim, 23 Eylül – 07 Ekim 2018 tarihlerinde, 8 üyenin katılımıyla gerçekleştirildi. 

Toplamda 5 gün (35 saat) süren eğitim sonunda katılımcılara; Proje Yönetim Enstitüsü (PMI)’ın düzenlemiş olduğu PMP Sınavı’na başvuruları için gerekli olan ve yetkin bir eğitmenden  "proje yönetimi eğitimi" almış olduğunu belgeler nitelikte katılım belgesi verilmiştir.